EE140
Calendar
Week | Lectures by Date | Topic | HW & labs | Reading (Razavi) | |
---|
1 | 1/21 1/23 | Introduction: what is 140 all about; Op-amps circuits in Lab 1 | hw1 Lab1 lab filesLab1 lab filesLab1 lab filesLab1 lab filesLab1 lab filesLab1 lab filesLab1 lab filesLab1 lab filesLab1 lab filesLab1 lab filesLab1 lab files | Ch1 Review Ch 2.{1-3} | |
2 | 1/28 1/30 | Taylor, Heaviside, and Bodediode, BJT, & MOs physic!MOS small signal model(s) , body effect | hw2 Lab2 RoI chart pdf pptx | 2,4 2.{5,6}skim | |
3 | 2.4 2.6 | Common source;single pole amplifiers;frequency and step response | hws | 3.3.{1-4}esp.figures 3.{5,6,18,20} 6.2 through eqn 6.22 | |
4 | 2.11 2.13 | CS; input poleInput capacitanceActive load | BuzsakiKoch2012 | hw4 Lab 3part1 | |
5 | 2.18 2.20 | Conmmon gate;Review Midterm Ⅰ-1 page notes,2 sides | sp08 mid1 solutions;fa09 mid1 solutions;sp15 mid1;sp16 exams | Frequency response notes | |
6 | 2.25 2.27 | Presidents’ Day- no classesCurrent mirrors; Differential pairDifferential amplifier | hw5 | 5.1.esp.Figures 5.{5,7,10,11} 4.{1,2} through Figure 4.14 | |
7 | 3.3 3.5 | 2 stage op-amp frequency response feedback,stability compensation | hw6 Lab 3part2 | 6.2 Miller compensation figures 10.{1-6} | |
8 | 3.10 3.12 | 2 stage op-amp common mode and differential gain RHP zero from Cc | | 5.3 esp. Figures 5.(23, 29.30} | |
8 | 3.17 3.19 | RHP zero, Current mirror pole/zero doublet:Supply-independent biasing | hw7 Lab 4 | | |
Week | HEALTH | SPRING BREAK | HEALTH | HEALTH | |
---|
10 | 3.31 4.2 | Supply-independent biasingmidterm reviewMidterm Il - Extended class period???? | sp08 mid2;sp15 mid2;old exams | | |
11 | 4.7 4.9 | Telescopic & Folded cascodeFolded cascode, biasingSwitched capacitors; ADCs and DACS; | Midterm 2 Lab 5 | 9.2 5.2 Wikipedia:ADC,SAR,ADC | |
12 | 4.14 4.16 | Switched capacitors: ADC, PGAMOS switch; regulators | projecthw8 | 13.2 StrongArm | |
13 | 4.21 4.23 | StrongArm latch Charge injection Presenting results | | | |
14 | 4.28 4.30 | rail-to-rail input and outputRi, Ro, and feedback noiseⅠ | | | |
15 | 5.5 5.7 | RRR week. Project presentations. | 15spFinal 09faFinal Final Exam | | |